Top Five Factors That Control Energy Savings
There are five drivers of EMS project payback. We set out to learn which are the most powerful drivers affecting project payback. We gathered 10+ years of real-time savings data, and analyzed the elements that affect each of our properties.
Download the Whitepaper
We estimate that project payback is typically approximately 2-5 years depending on industry, size of deployment and level of integrations. There are many factors that weigh into this estimate. Find out what the top factors are.